SPC Simulator

Watch your process part by part, and see what Cp, Cpk, Pp and Ppk really mean.

0parts 0out of spec 0signals
1

Your part: what are you measuring?

Keep the crimp example, or pick one close to your own work. The example also sets how the part is checked.

Enter the spec as it appears on the drawing. Changing the spec restarts the run.
Change how we check (parts per check, chart type)
Parts per checksubgroup size n
Which chart should I use?

Start with one question: how many parts can you sensibly measure together at each check?

ChartUse when
I-MR
n = 1
Only one reading makes sense per check: one value per batch or heat (bath pH, furnace temperature, hardness per heat-treat load), destructive or expensive tests (pull force, burst test), slow processes (a few parts per shift).
X̄–R
n = 2 to 9
Parts are quick and cheap to measure and come off the machine one after another: machining, moulding, stamping, crimping. The shop-floor standard; usually n = 3 to 5 consecutive parts.
X̄–S
n ≥ 10
Large subgroups, or the calculation is done by software or an automatic gauge. S uses every reading; R only uses the largest and smallest, so it loses information as n grows.

Rule for any subgroup: the parts in one check must be made under the same conditions (same machine, cavity or spindle, consecutive parts). Mixing cavities, spindles or batches in one subgroup hides real problems.

Continuous processes (steel, aluminium, chemicals, paper): most data is one value per heat, cast, coil or pot, so I-MR is the everyday chart. Two traps: readings taken seconds apart from an online gauge are related to each other, which makes limits too tight; and if you subgroup readings within a coil, the X̄ chart will flag every coil-to-coil difference. Chart one value per coil (I-MR), or use an I-MR-R chart.

Counting instead of measuring? (good/bad, number of defects) Use attribute charts: p or np for defectives, c or u for defects. They are not covered in this simulator.