Training programme

SPC training: read what your process is telling you.

Many plants plot control charts every shift and nobody acts on them. Others react to every point and make the process worse. This programme teaches your team when to act, when to leave the process alone, and what Cp, Cpk, Pp and Ppk really mean.

Plan SPC training for your team Join an open class

  • In your plant, or an open class
  • Awareness 4 hours, practitioner 1 or 2 days
  • 2 days includes your own data
  • English and Tamil

Is this for you?

  • Control charts are filled in, but nobody can say what they show.
  • Your Cpk looks good, yet customers still find problems.
  • Operators adjust the machine after every measurement "to be safe".
  • People confuse Cp with Pp, or think they need different data for each.

Who should attend

Quality and process engineers, supervisors, line leaders, and operators who record SPC data. Mixed groups work well: operators collect the data; engineers decide what to do with it.

What participants practise

  • Running a live process on the free SPC simulator: centred, off-centre, too wide, tool wear, batch-to-batch jumps, an over-adjusting operator
  • Choosing the right chart: I-MR, X̄–R or X̄–S, and why the subgroup matters
  • Calculating control limits by hand once, so the software is no longer a black box
  • Reading signals: points beyond limits, runs and trends, and what usually causes each
  • Cp, Cpk, Pp and Ppk from the same data: why they differ and what the gap tells you

Choose the format

Format For What it covers
Awareness (4 hours) Operators, supervisors What a control chart shows, when to act and when not to
Practitioner (1 day) Engineers, quality team Chart selection, control limits, signals and capability indices, on the simulator
Practitioner (2 days) Engineers with live data More chart types and studies, plus your own data from the line

4 hours includes a tea break; a full day is about 8 hours, with lunch and two tea breaks. This course is also part of the core tools courses. A full review of your own control charts and capability studies is consulting work, not part of the course. Ask us about it.

What changes afterwards

Your team stops reacting to noise and starts reacting to real signals. Capability numbers get calculated correctly and explained correctly to customers.

Questions people ask

Which reference do you follow?

The AIAG SPC reference manual. Please use a licensed copy; Kattamaipu is independent and not affiliated with AIAG.

Do participants need statistics?

No. Basic arithmetic is enough. The simulator does the heavy lifting.

Can you cover attribute charts (p, np, c, u)?

Yes, if they matter for your process.

Plan SPC training for your team

Let's talk about what's happening on your floor.

A short message is enough. You'll get a reply within one working day.

Discuss your challenge Chat on WhatsApp