Training programme

FMEA training: find the risks where they really are.

An FMEA filled in by one engineer at a desk usually misses what really goes wrong. A good FMEA comes from the right people in the room, walking the process step by step. This programme builds that habit, in the AIAG-VDA method or the AIAG 4th edition format your customer requires.

Plan FMEA training for your team Join an open class

  • In your plant, or an open class
  • Awareness 4 hours, practitioner 1 day
  • English and Tamil

Is this for you?

  • Your PFMEA was copied from another part or a template, and nobody trusts it.
  • RPN or Action Priority numbers are chosen to avoid actions, not to find risk.
  • Defects escape that the FMEA never mentioned.
  • You need to move from the AIAG 4th edition to the AIAG-VDA method.

Who should attend

Process, product and quality engineers, plus supervisors and experienced operators. The people who run the process see failure modes that engineers miss, so a mixed group is strongly recommended.

What participants practise

  • The AIAG-VDA seven steps: planning, structure, function, failure analysis, risk analysis, optimisation, documentation
  • Building a structure and function analysis for a real process step
  • Failure chains: linking effect, failure mode and cause correctly
  • Rating severity, occurrence and detection honestly, and using Action Priority
  • Linking prevention and detection controls to the control plan
  • Practising on the free FMEA simulator: building the block diagram, structure tree, P-diagram and failure network, and seeing how they write the worksheet

Choose the format

Format For What it covers
Awareness (4 hours) Supervisors, operators What an FMEA is for, and how their knowledge feeds it
Practitioner (1 day) Engineers The full method on a sample part and process, with ratings and Action Priority

4 hours includes a tea break; a full day is about 8 hours, with lunch and two tea breaks. This course is also part of the core tools courses. DFMEA can be added for design-responsible teams. Building or reviewing your own FMEA on your floor is a full review, done as consulting: see the FMEA & Control Plan Review.

What changes afterwards

Your FMEA becomes a working document the team trusts, linked to the control plan and updated when the process changes.

Questions people ask

AIAG 4th edition or AIAG-VDA?

Both. The programme follows the method your customer requires, and explains the differences if you're moving between them.

Do you provide the manual?

No. Please use a licensed copy; Kattamaipu is independent and not affiliated with AIAG or VDA.

Can we use our own part?

Yes, that's the best way. Under NDA if needed.

Further reading

Plan FMEA training for your team

Let's talk about what's happening on your floor.

A short message is enough. You'll get a reply within one working day.

Discuss your challenge Chat on WhatsApp